Description
Primary Current Injection Test Sets are used to loading, Calibration, and testing of CT Bimetals relays, Protection relays etc. Mostly Primary Injection Test set is designed as per customer specification. The Primary Injections Test sets are of 15 minutes ON/30Minutes OFF duty i.e. testing duty only. Loading transformers are designed for continuous use for Temperature Rise or bus duct/Bus Bar etc. Optional accessories requirement may include cable termination, timer, Temperature Indicator, multiple contractors, individual Phase control etc. Equipment is Compact in nature. It is available in portable trolley type/stationery type model And Optional Digital/Analog timer. Main Transformer up to 25,000Amps.
Features
Technical Specifications
Three Phase Primary Current Injection Test Set |
||
Sr. No. |
Parameters |
Description |
1 |
I/p Voltage |
380/ 400V Three Phase 50/ 60HZ AC Supply |
2 |
O/p Current |
Up to 25000A |
3 |
Capacity |
Up to 500KVA |
4 |
Duty Cycle |
Intermittent or continuous |
5 |
Control |
1- The unit can be manual/motorized control for current variation and push-button controlled. |
6 |
Power Components |
1- Step down transformer : 3 Nos. double wound transformer shall be used for supplying high |
7 |
Metering |
1- Ampere meter : 3 Nos. Digital Ampremeter shall be provided with 0.5 classes CT to indicate |
8 |
Termination |
An output is brought on Copper bus-bars |
9 |
Control Panel |
(i) ON/OFF switch |
10 |
Regulating Transformer |
Will be suitable for Motorized operation having limit switches, lifting arrangement |
11 |
Step Down Transformer |
Shall be air cooled type. Primary winding having DCC insulation and the secondary winding of |
|
|
![]() |